industrial safety press releases and articles

Events

Safety Management for Turnarounds and Shutdowns webinar series

United Safety invites you to watch any one of three 30 minute webinars related to managing safety during industrial turnarounds.  Or register for all three at once.

All of the Q&A this webinar generated is posted to our LinkedIn discussion board, we'd love to continue the conversation with you there!


 

  On-site Dispatch Systems for TAs:

“Three game changers for turnaround safety management that lower costs and increase efficiency”

 On-site dispatch systems for Industrial plant turnarounds improve tool time

  Contractor On-boarding for TAs

“A simple solution re on-boarding contractors for TAs that lowers costs and delays”

 

 Contractor onboarding prior to and away from the TA solves several key bottlenecks

 

  Innovative new system for supplying breathing air:

“Eliminate TA down time because of supplied air interruptions”

 

 High pressure and volume air delivery systems remove the need to deliver air bottles to work areas

 

Highlights:

  • Use a “courier” like system for safety equipment.
  • Dispatch systems are proven to increase tool time
  • Do more with less resources; know what is being used by whom
  • No lost equipment, no missing equipment bottleneck, no back-end billing
  • The increase in efficiency makes safety a driver, not a bottleneck

Highlights:

  • What can be done off-site, pre-arrival, should be done off-site
  • Managing contractors on-site during a TA is vital to preventing bottlenecks
  • Outsourcing + offsite can save big dollars and time
  • Contractors arrive better trained, ready to work
  • Mitigate the bottleneck that is on-boarding
  • Valuable space onsite is saved

Highlights:

  • Newer systems allow for re-filling of supply without bottle change-out
  • Put your supply in an un-used part of the site
  • Run high pressure line to regulator boxes inside the site
  • Air supply that is outside of congested areas is easy to keep filled with no interruptions
  • Air supply that does not need to be lifted to vertical locations eliminates down-time for replacement


 

Register to receive all three recordings.

Full Name 
Job Title 
Email 
Company 
Phone 
Comment